The response to the Gold Standard Requirements for Digital MRV Solutions consultation. Internal deadline 18 Nov 2026. Each answer through the smallholder unit-economics lens: one question, one number, one take.

Status: Draft in progress. Read #1 (draft answers) ships 31 Oct. Final submission 18 Nov.

Q13.2.4

Time of observation

Are the arrangements at 3.2.4(ii) and (iii) achievable with monitoring hardware in current use? What maximum interval under (iii)?

Q23.4.6

Sample retained for corroboration

Should a minimum sample be stated in these requirements?

Q33.6.7

Plausibility controls

Is the 'physical interference' test capable of consistent application?

Q47.2.4

Data-availability thresholds

Are the default thresholds (90% / 80%, 12-month lookback) achievable across settings? When should a methodology set different thresholds?

Q57.3.4 / 7.3.5

Interim Issuance proportion

The proportion issued under the Interim Issuance Track (90%) and the reduction after an adverse Full Issuance finding.

Q66.6

Provider-VVB affiliation

The prohibition on affiliation between a recognised solution provider and an approved VVB. Is the definition right?

Q77.3 / 8.3

Interim period and site visits

Can a cycle longer than twelve months between physical site visits be supported with a conforming solution? What would be required?

Q88.6

Report contents

Is the list of matters a validation/verification report must state complete? Should it be a checklist?